About Engineering and Operations committee

VISION:

  • Decreasing the final costs and times of drilling operations

MISSION:

  • Determining the required structures for an optimized drilling
  • Developing an evaluation and ranking system for drilling contractor companies
  • Creating constructive interactions in both engineering and drilling operations
  • Reducing the non-productive time(NPT) drilling times
  • Integrated look to the cost of drilling an individual well
  • Investigating the drilling equipment at technical, quality control, manufacturing, repairing, preserving and calibrating sections

SUB COMMITTEES:

  • Optimization and Drilling Engineering
  • Drilling Operation
  • Drilling Management

BACKGROUND:

  • 900 man hours
  • 30 meetings
  • 31 attended companies
  • 38 members