VISION:
- Decreasing the final costs and times of drilling operations
MISSION:
- Determining the required structures for an optimized drilling
- Developing an evaluation and ranking system for drilling contractor companies
- Creating constructive interactions in both engineering and drilling operations
- Reducing the non-productive time(NPT) drilling times
- Integrated look to the cost of drilling an individual well
- Investigating the drilling equipment at technical, quality control, manufacturing, repairing, preserving and calibrating sections
SUB COMMITTEES:
- Optimization and Drilling Engineering
- Drilling Operation
- Drilling Management
BACKGROUND:
- 900 man hours
- 30 meetings
- 31 attended companies
- 38 members